The correct answer is: Job costing.
Backflush costing is the method that utilizes sequentially tracking track costs in 4 steps.
Process costing works well with backflush system & operational costing is a hybrid od job & process so its utilize it too
The only method that does not utilize it is JOB COSTING METHOD